Line Extension Cost Estimator

Line Extension Cost Estimator

This tool provides a ballpark estimate of what it may cost you to install electric facilities for service to your home. The estimate is calculated based on information you provide and may not reflect conditions unique to your site.

Costs associated with underground facilities such as trenching, conduits, and vaults are the customer’s responsibility. However, for your convenience, estimated costs for conduits and vaults are included in this tool. Trenching costs are NOT included.

This tool is not intended to determine a design, specific route or identify how facilities will be installed on your site. Actual design and advance payment will be determined after you meet on-site with a Tillamook PUD Engineering employee.

Start

0$

Thank you for completing the cost estimate! Please contact Tillamook PUD Engineering Department with any further questions.

Overhead or Underground

Will the new service be overhead or underground?

Invalid choice.

Next

New or Existing Service

Will this be a new or existing service?

Invalid choice.

Next

Single or Three Phase

Will the new service be single or three phase? Typically, single phase power is for residential services, and three phase is for commercial, industrial, and irrigation.

Invalid choice.

Next

Total Distance

Enter the total distance in feet to the construction site from existing TPUD facilities.

Invalid choice.

Next

Overhead or Underground?

Will the new service be overhead or underground?

Invalid choice.

Next

Please Contact Us

Contact Tillamook PUD to discuss your construction plans. We can be reached at (503) 815-8629.

Invalid choice.

Next

Your Service Size

Invalid choice.

Next

Metering Fee

Invalid choice.

Next

Meter / Transformation Fee

Invalid choice.

Next

Transformation Fee

Invalid choice.

Next

Metering Fee

Invalid choice.

Next

Transformer Cost

Invalid choice.

Next

Your Cost Estimate

The final estimated cost is:

The information on this page will be sent to the email entered above.

Any notes entered above will be included in the email that will be sent to you. Please bring this information with you when you meet with a TPUD Engineering employee.

Your Selections

Description Service Size Distance (ft) Cost
Discount:
Total Estimated Cost:

Finish